久久久久人妻啪啪一区二区-久久久久人妻一区二区三区-久久久久人妻一区精品-久久久久人妻一区精品色-久久久久人妻一区精品色欧美-久久久久人妻一区精品性色av

Service Flow

Service process

Common Problem

1.What information do PCBA processing need to provide?

Electronic version controlled BOM files, PCB files, GERBER files, PDF location map, special welding requirements, etc.

2.PCBA routine processing flow?

Printing - patch - reflow -AOI inspection -QC sampling - plug-in - wave soldering - repair welding - Cleaning - general inspection -ICT-FCT-OQC- packaging

3.What are the requirements for the PCB production routine?

1. the process edge 5mm (especially the PCB plate edge has device plate, special shape plate) and the process edge needs to increase in the long side of the 2. diameter 1-1.5mm MARK point, to ensure the accuracy of the mounting; 3. if the tailor board, it is necessary to pay attention to the splicing way, such as too much splicing board or V cutting too deep, easy to cause PCB plate change shape.

4.What do you want to do?

1.PCB board components number 2.PCB board size less than 50mm must do the puzzle. 3. before making a plate, we should contact our technology and communicate with each other.

5.How to control the quality of welding?

According to the industry IPC-610A-F standard and customer special requirements, strict control and control from human, machine, material, law and ring are carried out. The specific welding quality control and control should be defined according to different PCB boards.

6. In which case is the design of PCB board unreasonable, which leads to poor welding?

There can be no holes on the 1.PCB welding plate. As the tin inflows into the hole, the size of the weld plate of the solder less tin 2. patch is not consistent with the BOM requirements. The size of the large weld plate is small and the size of the small welding disk is large; the diameter of the 3. plug-in plug is small or large or the distance between the two holes is not matched with the material. 4.PCB board components layout, chip and other large devices, plug-in materials should be placed as much as possible TOP surface, BOT as far as possible design resistance capacitance parts.

7.What are the requirements for processing materials for incoming materials?

1. the material is complete, the 2. incoming packaging is clearly described, and there are no deformation, oxidation, overdue and wrong material. 3. as far as possible for vacuum packing

8.In what case is it recommended to increase the soldering of wave peak control tools?

1. double sided patch board, and product plug-in materials are more. 2. has begun to mass production.

9.How long is the delivery date under normal conditions?

After the material is complete, under normal circumstances, according to the production plan, in about 1-2 weeks.

国产乱码精品一区二区三上 | 国产精品亚洲成在人线 | 狠狠色丁香婷婷综合 | 国产成人无码一二三区视频 | 美女福利视频国产片 | 青青草原精品99久久精品66 | 中文字幕无码av波多野吉衣 | 久激情内射婷内射蜜桃 | 澳门一级特黄真人毛片 | 最近中文字幕完整版免费 | 国产69精品久久久久久久 | 亚洲av无码日韩精品影片 | 男ji大巴进入女人的视频 | 国产va免费精品高清在线 | 亚洲av无码一区二区三区网址 | 国内精品久久久久影院一蜜桃 | 久人人爽人人爽人人片av | 欧美日韩综合一区二区三区 | 成av人电影在线观看 | 亚洲国产精品日韩av不卡在线 | 亚洲国产精品嫩草影院 | 美女视频性感网站黄色 | 国产精品婷婷久久爽一下 | 国产精品永久免费视频 | 欧美真人性做爰一二区 | 国产v亚洲v天堂无码久久久 | 老汉精品免费av在线播放 | 高清一区二区在线观看 | 门卫又粗又大又长好爽 | 欧洲乱码伦视频免费 | 天天天天躁天天爱天天碰 | 色噜噜狠狠色综合成人网 | 亚洲欧美不卡高清在线 | 欧美人和黑人牲交网站上线 | 欧美两根一起进3p做受视频 | 久久久久亚洲av成人网人人软件 | 18禁无遮挡羞羞污污污污网站 | 性色av一区二区三区夜夜嗨 | 美国一级免费毛片 | 香蕉人妻av久久久久天天 | 国产操逼视频 |